A pitched, tiled house lit from within at night

Nine checks beforeyou pay the next bill

You do not need to know construction to spot the things that cost the most later. Nine of them can be checked with your eyes, your phone and ten minutes on site.

Check the steel before the pour, the curing after it, the waterproofing before tiling, the conduits before plaster, and the levels before flooring. Each one is cheap to fix on the day and expensive to fix once it is covered. Photograph every one, with the date.

The problems you can see in a finished house are almost never the expensive ones. It is the steel nobody checked before the pour, the slab that was watered for four days instead of fourteen, the sunken bathroom that was tiled over a membrane nobody tested — all sealed under plaster before anyone thought to look.

You do not need to become an engineer. You need to know which nine moments matter, and to be there — or have someone there — on those days.

The nine

01

Soil test before the foundation

Ask to see the soil report for your plot, not the one next door. The foundation type should be written against it.

WhyA foundation copied from the neighbouring plot is the most expensive guess on the whole job.
02

Steel, before the concrete truck

Walk the slab with the drawing. Count the bars in one bay, check the spacing, check the cover blocks are actually under the mesh. Photograph it.

WhyOnce concrete is in, nobody can check it again. Ever.
03

Curing — for the full period, not four days

Come back on day seven and day twelve. The slab should still be wet or covered.

WhyIS 456 asks for a minimum of seven days on ordinary cement and ten on blended — longer in hot, dry weather. Short curing is invisible now and shows as cracks later.
04

Waterproofing before anything covers it

Bathrooms, terraces and sunken slabs get a ponding test: fill it, leave it 24–48 hours, look at the ceiling below.

WhyLeaks are the most common serious defect in Hyderabad homes, and the only honest time to find one is before tiling.
05

Conduits and plumbing before plaster

Photograph every wall with the conduits and lines still visible, and keep the photos.

WhyIn five years, when somebody needs to drill a wall, that photo is the difference between a hole and a flood.
06

Block work — plumb, line and joint

Hold a spirit level on a few walls. Look down the length of a wall from one corner.

WhyOut-of-plumb walls get corrected in plaster thickness, which quietly eats your room size and your material.
07

Levels before flooring

Check the fall in wet areas runs towards the drain, and that door thresholds line up floor to floor.

WhyA floor laid to the wrong level cannot be adjusted afterwards without lifting it.
08

Samples in daylight, in your hand

Approve stone, tile, timber and hardware physically, on site, in daylight — not from a screen.

WhyScreens lie about colour and tell you nothing about weight, edge or finish.
09

Snag list closed with you standing there

Walk the house with the list, room by room, and sign each item off as it is done.

WhyA snag list closed by email is a snag list that is still open.
Building this year

Send us the plot or the plan. We will tell you what it will really take, in writing, before you commit to anything.

Start a conversation

Keep a record, not a memory

Every one of these checks is worth a photograph with the date on it. Not to catch anybody out — to end arguments before they start, and to give you a file you can hand to a plumber ten years from now.

On our own sites this record is part of the deliverable: each stage is checked against a fixed list and photographed before the next trade begins, and that record goes to you rather than staying in our file. The full sequence is set out in how we work.

Looking across a courtyard from the hall
I am not technical. Can I really check these myself?

Yes for most of them. Counting bars, looking at a wet slab, watching a ponding test and holding a level need no training — only being there on the right day. For the soil report and the structural drawing, ask your engineer to walk you through it once.

My contractor says checks slow the work down.

A pre-pour check takes twenty minutes. Opening a slab afterwards takes weeks. Any contractor who is confident in the work will not mind being looked at.

What if I find something wrong?

Say it on the day, in writing, with the photograph attached, before the next trade covers it. Almost everything on this list is cheap to correct while it is still visible.

Do you do this for clients who are not building with you?

We supervise where we have designed. We do not take on inspection-only work on somebody else's project — it rarely helps the client as much as it sounds like it will.